ID 630110
Archived
San Diego County
Owner Reference: 01-06-78-51412
Bid Date: 07/26/2022 at 02:00pm
Pre-Bid: 06/01/2022
OR 6/15/22 @ 1:00 pm. Must attend one. Pressure Reducing Station located on Welk View Drive, Escondido, CA 92026, north of Welks Resort (refer to Site Map on Appendix B). Prospective bidders MAY NOT visit the Project Sites without making arrangements through the Project Manager.
Estimate: $2,600,000
Trades: A - General Engineering Contractor GEC, C34 - Pipeline Contractor: Wastewater, Water Mains & Sewer Systems, may include Video Camera Inspections
The project generally consists of abandonment of existing 10-/12-inch buried steel potable waterline, water services and appurtenances on improved Gordon Hill Road (Private) and fenced back yards. Approximately 4,700 linear feet of 12-inch diameter buried polyvinyl chloride (PVC) potable waterline including valves, water services, appurtenances shall be installed within Gordon Hill Road (Private) and VCMWD Easements, between Old Castle Road (Public) and Welk View Drive (Private). Segments of existing pipeline in conflict with proposed waterline alignments shall be removed and disposed. Tie in connections are required within Old Castle Road, an existing developed County of San Diego public road and Welk View Drive (Private). 365 calendar days duration. This project funded through the State Water Resources Control Board and DBE participation requirements apply. Bonds required. Prevailing wages.
Valley Center Municipal Water District (VCMWD) CA
District Engineering
(760) 735-4500
Login or create an account To view email
Published 05/26/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.