ID 635600
Archived
Madison County
Owner Reference: CNW275 / NH-SIP-I-40-1(363) / HSIP-I-40-1(365)
Bid Date: 08/19/2022 at 10:00am
Trades: Excavation & Grading - General Engineering Contractor, Roadway Drainage, Stormwater, Manholes, Culverts: Installation, Repair & Removal - General Engineering Contractor, Earthwork and Paving Contractor - General Engineering Contractor, Electrical Contractor - Including Lighting, Luminaires and Possible High Voltage, Traffic Signals, Control & Monitoring - Electrical & General Engineering Contractor, Construction Zone Traffic Control: Barricades, Barriers, Guardrail Attenuators, Crash Cushions, Bollard Systems, Direction of Ve, Pavement Marking & Striping, Landscaping Contractor: Grounds Maintenance, Clearing, Grubbing, Fertilizing, Mowing, Planting, Trimming, Rooting, Mulching, Highway, Parking Lot, Road Improvement, Pavement Repair: Resurface Cold Mix Slurry Chip Seal - General Engineering Contractor, General Engineering Contractor GEC
Project description: The grading, drainage and paving with Portland Cement Concrete on I-40 (Exit 93) at the S.R. 152 (Law Road) interchange (L.M. 25.85 - L.M. 26.86). Project Length - 0.909 miles. The miscellaneous safety improvements on I-40 from near the underpass at Stewart Road (L.M. 22.35) to near the Henderson County line (L.M. 27.95). Project Length - 5.600 miles. Total Contract Length - 6.509 miles. Completion Time - On or before 8/31/2023. DBE goal 7%. Each prospective bidder and subcontractor will be required to file the “Prequalification Questionnaire” form provided on the Construction Division’s website at least 14 days prior to the date of bid opening. Bonds required. Prevailing wages.
State of Tennessee Department of Transportation (TNDOT) TN
Headquarters Construction Office
(615) 741-2414
Published 07/27/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.