Graham Hill Water Treatment Plant Entrance Improvements Project, Santa Cruz, CA

Santa Cruz County

Owner Reference: CWO 2021-003

Bid Date: 04/22/2021 at 02:00PM

Pre-Bid: 04/06/2021
Graham Hill Water Treatment Plant, 715 Graham Hill Road, Santa Cruz, CA 95060. Masks are a must.

Estimate: $250,000-$285,000

The work involves expanding the existing roadway entrance to the GHWTP into a two-lane road, demolish the existing gate and replace it with two separate gates, relocate existing access control system and cameras, relocate existing personnel gate and mailbox, install traffic signs, install engineered gravel strips on the north and south side of the entrance roadway. Bonds required. Prevailing wages. Q&A directed to tom.ferguson@hdrinc.com.

City of Santa Cruz, Public Works, CA

Morgan Abbett
 (431) 699-8885
 (831) 420-5201
 Login or create an account To view email

Published 03/26/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.