Great Pond Road Stabilization, North Andover, MA

Essex County

Bid Date: 10/07/2021 at 11:00am

Estimate: $620,000

The Work under this Contract includes, but is not limited to the installation of 280-linear feet of sheet pile to stabilize a roadway embankment, replacement of guardrail, the replacement of local drainage structures that includes a new manhole, piping, and headwall, stabilization of roadway embankment with riprap and boulder, paving, erosion controls, dewatering within a lake to install drainage headwall, and all appurtenances and incidental work necessary to complete the construction. Construction must be substantially complete 30 calendar days and final completion 60 calendar days from and including issuance of a notice to proceed, and/or receipt of fully executed contract. Bidder must hold a current MassDOT pre-qualification for the work limit required by MassDOT. Bonds and prevailing wages

Town of North Andover, MA

John Borgesi
 (978) 685-0950
 (978) 688-9573
 Login or create an account To view email

Published 09/16/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.