ID 577387
Archived
Lancaster County
Owner Reference: 2021-06
Bid Date: 03/31/2021 at 11:00am
The work is generally described as green infrastructure and stormwater construction in four (4) areas within the City and referred to as the James Street Mennonite Project, the Tobacco Alley Project, the Highland Avenue Project and the Saint Joseph Street Project. Project maps and general locations are set forth in the introduction and project description. Bonds required. Prevailing wages apply.
City of Lancaster, PA
Kevin Flanagan
(717) 735-3433
Published 03/02/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.