ID 576624

Archived

Harrisburg International Airport Cargo Apron Expansion, Phase IV, Harrisburg, PA

Dauphin County

Owner Reference: 2007-002

Bid Date: 04/06/2021 at 02:00pm

Pre-Bid: 03/02/2021
https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZDQ4ODg2YmQtZGM5Mi00MjM4LWFjNzMtZTQzODM2OGNlY2Jh%40thread.v2/0?context=%7b%22Tid%22%3a%2216ed5ab4-2b59-4e40-806d-8a30bdc9cf26%22%2c%22Oid%22%3a%22d693f1b2-fc32-4ee7-965b-b25b6fdfaec8%22%7d Or call in (audio only) (877) 286-5733,,305295065# United States (Toll-free) Phone Conference ID: 305 295 065#

The Drainage and New Outfall project is part of a multi-year, multi-construction package. Phase IV work consists of drainage installation from Taxiway G to the Susquehanna River. This proposed drainage construction includes installation of 68-inch by 43-inch, and 83-inch by 53-inch elliptical concrete pipe, 30-inch , 42-inch, and 60-inch reinforced concrete pipe, an 84-inch by 60-inch concrete box culvert, a new outfall end section to the Susquehanna River. Other utility work includes relocation of a sanitary force main. The 84-inch by 60-inch box culvert outfall will be constructed through the levee into the River. The contractor will need to salvage the articulated concrete block system through the project area and replace it upon completion of the reconstructed levee. A cofferdam needs to be placed to protect the Airport from the River while the levee construction is ongoing. The proposed drainage system under Runway 13-31 includes twin 60-inch reinforced concrete pipes constructed utilizing microtunneling and then jacked under Runway 13-31. Prior to the microtunneling, respective grouting improvements plan will be conducted beneath the runway. This microtunneling construction work will be completed in order to maintain and preserve Runway 13-31’s function and use. The drainage system installation under Taxiway A will be performed utilizing the cut and cover method to install 83-inch by 53-inch elliptical concrete pipe. The segment of Taxiway A removed will need to be reconstructed. This work also includes reconstruction of the centerline lighting and underdrain system. The drainage system segment from Taxiway A to Taxiway G includes installation of 68-inch by 43-inch elliptical concrete pipe installation via cut and cover. Bonds required.

Susquehanna Area Regional Airport Authority, PA

James Aiello
 (717) 948-3900
 Login or create an account To view email

Published 02/24/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.