ID 639152

Archived

Harry Hines Multimodal Connection, Dallas, TX

Dallas County

Owner Reference: 2022-048-6963

Bid Date: 10/20/2022 at 03:00PM

Pre-Bid: 09/08/2022
https://gcc02.safelinks.protection.outlook.com/ap/t-59584e83/?url=https%3A%2F%2Fteams.microsoft.com%2Fl%2Fmeetup-join%2F19%253ameeting_Y2NhNzU4YjMtNDAyMS00ZDMyLWI3ZWQtZDM2NTc2MTM5NjQ3%2540thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%252251adcfad-72f1-479c-b28f-52412e04014b%2522%252c%2522Oid%2522%253a%252209e108e9-7ffc-46b9-b3d0-3a15206a0e1d%2522%257d&data=05%7C01%7Cjames.doss%40dallascounty.org%7Ce6a87978957041601ac608da86b3213b%7C51adcfad72f1479cb28f52412e04014b%7C0%7C0%7C637970401187424630%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=ICPKPG9XriJizpj2dqlqhg%2BqLrl3iUSrqcwjYfNQl5s%3D&reserved=0

Trades: General Engineering Contractor GEC

The Harry Hines Multimodal Connection Project will include a 10-foot-wide shared-use path on the east side and a 7-foot-wide sidewalk on the west side of Harry Hines Boulevard. The length of sidewalk and shared-use path will each be 1.7 miles. There are no existing bicycle or pedestrian facilities along Harry Hines Boulevard making it difficult for pedestrians to safely travel between employment and transit facilities. Bid Doc No. 05 Rev 1 Therefore, when constructed, the project will include a minimum of 2-foot green buffers between the curb and sidewalk on the west side and the curb and shared-use path on the east side of Harry Hines Boulevard. The project will enhance the crossing treatments by providing concrete curbs and replacing the curb ramps to make them Americans with Disabilities Act (“ADA”) compliant. Upgrades to the traffic islands is also a part of the project. The limits are from Webb Chapel Extension to Manana Drive. This Project will facilitate the movement of public transportation to benefit both the City of Dallas and Dallas County, which was selected in the Major Improvement Project. There are 365 working days per standard workweek allocated for construction of all improvements. Bonds required. Prevailing wages.

County of Dallas TX

James Doss
 (214) 653-7437
 Login or create an account To view email

Published 08/30/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.