ID 556679

Archived

High Service Pump Station 3-1 Expansion, Rockwell Co., TX

Rockwall County

Owner Reference: 101-0509-18

Bid Date: 09/29/2020 at 02:00pm

Pre-Bid: 09/15/2020
A meeting invitation will be sent to all plan holders, at latest, the day prior to this date.

Estimate: 15,000,000

This project involves the expansion of the High Service Pump Station 3-1 from a total capacity of 350 MGD to 450 MGD, which includes the installation of two (2) new 50 MGD pumps in the Pump 5 and Pump 8 locations, each with new motors controlled by adjustable frequency drives (AFDs). The existing Pump 5 pump and motor controlled by soft starter will be relocated to the Pump 9 location. New pump control valves, piping and associated appurtenances, structural supports and access platforms, and electrical and instrumentation equipment will be installed to support the Pump 8 and Pump 9 pumping units. The project also includes the construction of a new electrical building north of the existing pump station to house the proposed AFDs and associated electrical equipment.

North Texas Municipal Water District, TX

Stefanie Massey
 (682) 316-7674
 Login or create an account To view email

Published 09/17/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.