ID 629584
Archived
Thurston County
Owner Reference: 22-E09
Bid Date: 06/15/2022 at 12:00pm
Pre-Bid: 05/31/2022
Lat. 47-682426, Long-124.171776. Directions: Meet at mile post 15 on HOH-Clearwater, Approx 3 miles south of the Olympic Correction Center
Estimate: $364,000
Trades: Earthwork and Paving Contractor - General Engineering Contractor
The project consists of: • Installing temporary traffic control, erosion and sediment control measures prior to clearing and grading, • Removing the existing asphalt pavement (2,270 sq yd), • Excavating approximately 8,190 cy of unsuitable material from the existing embankment, • Hauling to a waste area and, • Installing a drainage blanket on the excavation slope and a perforated drainage system at the toe of the excavation and rebuilding the embankment (8,045 cy) with common borrow Bonds required. Prevailing wages.
State of Washington Department of Natural Resources WA
Sandra Swenson
(360) 902-1159
Login or create an account To view email
Published 05/22/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.