ID 583853

Archived

Hood Hall & Moffitt Hall Renovations, Asbestos Abatement & Hazardous Materials Abatement, Plattsburgh, NY

Clinton County

Owner Reference: 3547709999/CR3

Bid Date: 05/20/2021 at 02:00pm

Pre-Bid: 05/03/2021
Conference Call. Dial-in 1-866-394-2346 and use Conference Code: 507-566-7159

Estimate: $4,625,000 - $4,650,000

The project consists of the renovation of existing student bathrooms in Hood Hall and associated Hazardous Material Removals, Plumbing, Fire Protection, Fire Alarm, HVAC, and Electrical work. Work in the bathrooms shall consist of complete demolition of all partitions, accessories, tile finishes, ceilings, plumbing fixtures, and serving utilities. Hazardous material abatement and removal shall include but is not limited to gypsum wall board, textured ceiling finishes, exterior foundation waterproofing, and pipe insulation. Student bathrooms will be reconfigured, and new partitions and finishes provided. New interior finishes shall include porcelain ceramic floor and wall tile wood doors, gypsum board ceilings, ACT ceilings, and toilet room accessories. Plumbing work will include replacement of all supply and sanitary risers with branch piping installed to new fixture layout. Mechanical work will include replacement of hot water heat risers located in the bathrooms, replacement of exhaust duct, fans, installation of split system AC, laundry make-up air system, and modifications to the building BMS system. New lighting and power will be provided based on layout. Fire Alarm devices and Fire Protection sprinkler heads will be relocated as required by new plan. One elevator will be renovated at the end of construction. Additional work at Hood Hall includes reconfiguring existing toilet rooms, offices, Resident Director’s Apartment, and laundry rooms. In addition to new partitions, finishes and casework, mechanical, plumbing, fire protections, BMS, fire alarm and electrical systems will be modified to address new work. Moffitt Hall work is limited to the creation of a laundry room within the Resident Director Apartment and installation of a split unit AC system. Sitework is limited to Hood Hall and includes restoration of the site upon construction of new areaway and the installation of a new concrete pad and bike storage shelter. MBE goal is 3%, WBE goal is 3%, DVBE goal is 6%, and the EEO goal is 10%. Bonds and prevailing wages

Dormitory Authority Of the State of New York (Upstate Construction) Albany NY

Chris Aldrich
 (315) 403-1308
 Login or create an account To view email

Published 04/26/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.