ID 627837

Archived

Horse Landing Rd. and Elsie Dr. Septic to Sewer Project - Phase III, Palatka, FL

Putnam County

Owner Reference: 22-23

Bid Date: 05/26/2022 at 01:30pm

Pre-Bid: 05/12/2022
Government Complex located at 2509 Crill Avenue, Suite 200, Palatka, FL 32177

Trades: CF - Plumbing Contractor: may include Camera CCTV Inspections, RF - Plumbing Contractor: may include Camera CCTV Inspections, CU - Underground Utility GPS Location & Construction: Potholing, Cables, Tunnels, Pipes, Power, Communication, Water & Sewer, RU - Underground Utility GPS Location & Construction: Potholing, Cables, Tunnels, Pipes, Power, Communication, Water & Sewer, Electrical Contractor - Including Lighting and Possible High Voltage, Sanitation System, Sewer Connection, Septic Tank Contractor, On Site Sewage Facility (OSSF); Tank Power Wash, Pressure Washing

The work shall consist of, but not limited to, abandonment / decommissioning of 30 residential septic tanks, installation of 30 low-pressure sewer pump systems, connection of each residential site to the low pressure sewer pump system, connection of each system to central sewer, gravity service tie-ins from existing homes to the low-pressure sewer pump system, all required electrical/control connections and upgrades, directional drilling, trench restoration, placement of temporary soil erosion and pollution control, maintenance of traffic, and placement of sod on all disturbed areas. The project is being funded through A Cost-Share Agreement between St. Johns River Water Management District and Putnam County under Contract #36925. This bid requires that the Prime Contractor and/or sub-contractor must have successfully completed a minimum of 20 individual sewer connections (septic tank abandonment included for each connection) where low pressure system grinder pump systems were required, possess a current valid Certified Plumbing Contractor’s License, Underground Utility and Excavation License, Electrical Contractor’s License, and be able to demonstrate their ability to complete 30 sewer connections and septic tank abandonments in 6 months. The primary contractor must perform 40% of the work. Project completion date: 12/21/2022 (180 days from pre-construction meeting/receipt of notice to proceed). Questions via email to Owner due 7 days prior to bid opening. Bonds required.

County of Putnam FL

Julianne Young
 (845) 208-7800
 Login or create an account To view email

Published 05/06/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.