ID 642405
Archived
King County
Owner Reference: HW2202231
Bid Date: 10/20/2022 at 02:00pm
Pre-Bid: 10/11/2022
Friendly Village Community Center, 18425 NE 9th Street, Redmond, WA 98052
Estimate: $108,537
Trades: HVAC Contractor: Heating Ventilating Air Conditioning and Controls, Air Chillers. Includes RTU's, General Contractor GC
Work consists of, but is not limited to, the replacement of two gas furnaces and the addition of two A/C condensers, along with alterations and adjustments to duct work, grilles, louvers, ventilators as indicated in the plan and specifications. Question deadline: 10/13/2022 at 09:00 a.m. Bonds required. Prevailing wages.
King County Housing Authority (KCHA) WA
Michelle Jackson
(206) 574-1100
(206) 574-1104
Login or create an account To view email
Published 09/29/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.