ID 545410

Archived

Intersection Improvements at Various Locations on Sr 138 Project, Atlanta GA

Rockdale County

Owner Reference: 0012816

Bid Date: 07/17/2020 at 11:00AM

A pedestrian walkway shall not be severed or relocated for non-construction activities, such as parking for construction vehicles and equipment. Movement by construction vehicles and equipment across designated pedestrian walkways should be minimized. When necessary, construction activities shall be controlled by flaggers. Pedestrian walkways shall be kept free of mud, loose gravel or other debris. When temporary covered walkways are used, they shall be lighted during nighttime hours. When temporary traffic barrier is used to separate pedestrian and vehicular traffic, the temporary barrier shall meet NCHRP-350 Test Level Three. The barrier ends shall be protected in accordance with Georgia Standard 4960. Curbing shall not be used as a substitute for temporary traffic barriers when temporary traffic barriers are required. Tape, rope or plastic chain strung between temporary traffic control devices are not considered as detectable and shall not be used as a control for pedestrian movements. All other bridge approaches not meeting the above criteria shall meet the 3/16 in. in 10 ft (5 mm in 3 m) straightedge requirement. When the distance between the ends of two bridges, the end of a bridge and an intersection, or the end of a bridge and a vertical or horizontal curve is less than 540 ft (165 m) and locations where the testing vehicle cannot maintain minimum testing speed while taking profile measurements will not be tested and will be subject to straightedge requirements. This project encouraged MBE/WBE participation.

Georgia Department of Transportation

Timothy Swink
 (404) 631-1138
 Login or create an account To view email

Published 06/29/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.