ID 629423
Archived
Chelan County
Owner Reference: 21-0246
Bid Date: 06/13/2022 at 11:00am
Pre-Bid: 05/24/2022
Attendance at one of the two mandatory pre-bid walk throughs of the project is required. The walk throughs will be held on Tuesday, May 24, 2022 and Wednesday June 1, 2022. For meeting location and time, please contact Jennifer Collins with the District, 509-687-3548.
Trades: Electrical Contractor - Including Lighting and Possible High Voltage, General Engineering Contractor GEC
The project consists of the replacement of the electrical gear for the B, C, D & F Pumping Plants, installation of the owner provided motor control centers, and creating indoor electrical rooms at each pumping plant through modification or replacement of the existing open-air shelters. Estimated completion date April 15, 2023 Bonds required. Prevailing wages.
Lake Chelan Reclamation District WA
Rod Anderson
509) 687-3548
Login or create an account To view email
Published 05/19/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.