ID 571716
Archived
Douglas County
Bid Date: 02/10/2021 at 02:00pm
Estimate: 120,000-160,000
The project consists of the following major items of construction: Basic Bid. Replace existing 4-inch water line with 178 lineal feet of new 8-inch water line. Approximately 86 lineal feet of new water line is to be supported beneath the bridge; and 92 lineal feed shall be installed by trench installation with asphalt surface removal and replacement. Work also includes new service line connection, gate valves, fittings, appurtenances, curb and sidewalk removal and replacement. Bonds Required. Prevailing Wages.
City of Myrtle Creek, OR
Lonnie Ranville
(541) 863-3171
Published 01/24/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.