ID 642110

Archived

Kennedy Generating Station Unit 7 and Unit 8, 4,160 kV Tie Buss, Jacksonville, FL

Duval County

Owner Reference: 1410898446

Bid Date: 10/18/2022 at 12:00pm

Pre-Bid: 09/27/2022
https://jeameeting.webex.com/jeameeting/j.php?MTID=ma4729c74a31621c6b32681e8cc3468ba. Those who would like to perform an onsite visit may contact William Donovan donowt@jea.com to be added to the site access list. Additionally, those attending a site walkthrough shall bring their own Personal Protective Equipment

Trades: Electrical Contractor - Lighting, Luminaires, High Voltage (HVE)

JEA is soliciting Bids for a General Contractor for the installation of a 4,160 Tie Circuit between Unit 7 and 8 the Kennedy Generating Station. (the “Work”) Electrical contractor scope includes, but is not limited to providing all tools, equipment, materials, and labor to install the following; • Three conductor 3600FT of MV cable circuit with a #2 insulated grounding conductor per set. Each parallel set conductor will be approximately 400FT long. Contractor shall provide all materials to terminate the cables at both ends. • Three 4”, 400FT RMC aluminum conduits as shown below. Conduits shall be installed, supported, and buried per NEC code. Underground conduit section shall be 4” schedule 40 PVC encased in 6” of concrete all around. • Three cantilever supports on the overhead water pipe rack shall be supported per the engineering design drawing to support additional conduit load. • Additionally, the Contract shall provide all materials to install control circuits to support the complete installation. Questions via email to Owner due 5 business days prior to bid opening. Bonds required.

Jacksonville Electric Authority (JEA) FL

Rodney Lovgren
 904) 665-7594
 Login or create an account To view email

Published 09/27/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.