ID 604775

Archived

Lampson Well Treatment System - Construction Management & Inspection Services, Seal Beach, CA

Orange County

Bid Date: 11/11/2021 at 02:00pm

The City of Seal Beach solicits proposals for professional construction management and inspection services for Lampson Ave water well project improvements. The City has retained Pacific Advanced Civil Engineering, Inc. (PACE) to design a H2S treatment system utilizing four (4) granular activated carbon (GAC) media vessels. This treatment system will also have the ability to be placed in a lead-lag configuration to treat other future contaminants, if ever identified. A treatment system schematic is included for reference. Estimated construction value is at $3 million. Estimate active construction duration is currently estimated at nine (9) months.

Bonds required. Prevailing wages.

City of Seal Beach

Iris Lee (x 1322)
 (562) 431-2527
 Login or create an account To view email

Published 10/19/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.