ID 627184
Archived
Jackson County
Bid Date: 06/01/2022 at 10:00am
Trades: Pipeline Contractor: Wastewater, Water Mains & Sewer Systems, may include Camera CCTV Inspections, General Engineering Contractor GEC
The Project consists of, but is not limited to the following major elements: Installation of approximately 1,671 LF of 8-inch waterline, connections to existing waterlines, meter reconnections, fire hydrants, valves and associated appurtenances. Time of completion for all work associated with this project shall be Ninety (90) consecutive calendar days from the date of a written "Notice to Proceed" from Owner. Questions via email to Owner. Work performed by Prime Contractor shall be at a minimum 30% of the contract value Bonds required.
City of Jefferson GA
Preston Elam
770-962-1387
Login or create an account To view email
Published 04/29/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.