ID 604684
Archived
Weber County
Bid Date: 10/28/2021 at 01:30pm
The work is located near 4875 South Midland Drive, Roy City, Utah. The work generally consists of replacing an existing bridge across the Layton Canal with a 13' x 6' concrete box culvert with concrete inlet and outlet transitions. The work includes demolition of the existing bridge structure, approximately 120 feet of new storm drain pipe, roadway restoration, and all other related appurtenances and associated work as indicated in the Contract Documents. All work specified in the contract documents shall be completed by March 15, 2022
Bonds required.City of Roy City
(801) 775-9191
Published 10/19/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.