ID 639823

Archived

Lift Station No. 40 Rehabilitation (ARPA), Altamonte Springs, FL

Seminole County

Owner Reference: ITB-22-045-RS

Bid Date: 10/05/2022 at 11:00am

Estimate: $2,200,000

Trades: RU - Pipeline Contractor: Water Mains, Sewer, and Wastewater/Reclaimed Water Systems, may include Video Camera Inspections, CU - Pipeline Contractor: Water Mains, Sewer, and Wastewater/Reclaimed Water Systems, may include Video Camera Inspections, CG - General Engineering Contractor GEC, RG - General Engineering Contractor GEC

The City of Altamonte Springs desires to secure the services of a qualified State of Florida Licensed General Contractors (GC) to perform the modifications to the existing Lift Station Number 40 facility as designed by CDM Smith, or as directed by the City of Altamonte Springs Public Works Department. The anticipated time to achieve Substantial Completion will be 11 months from the Notice‐to‐Proceed. An additional thirty (30) calendar days will be provided to achieve Final Completion and Acceptance of the project for a total time period of 12 months. Questions due via email to Owner by 9/15/2022, 4:30pm. Bonds required.

City of Altamonte Springs FL

Roxana Siaca
 407/571‐8080
 407/571‐8082
 Login or create an account To view email

Published 09/07/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.