Lilac Road Pipeline Upsize Project, Valley Center CA

San Diego County

Owner Reference: 01-06-78-51417

Bid Date: 09/08/2022 at 02:00pm

Pre-Bid: 07/13/2022
OR 7/28/22 @ 1 pm. Must attend one at intersection of Lilac Road and Hiedaway Lake Road, Valley Center CA 92082.

Estimate: $3,100,000

Trades: A - General Engineering Contractor GEC, C34 - Pipeline Contractor: Wastewater, Water Mains & Sewer Systems, may include Video Camera Inspections

The Lilac Road Pipeline Upsize project generally consists of the installation of approximately 6,000 linear feet of 8-inch and 12-inch diameter buried polyvinyl chloride (PVC) potable waterline including valves, water services, appurtenances and the abandonment of existing 6-inch and 8-inch diameter buried asbestos cement potable waterline, water services and appurtenances, located within Lilac Road, an existing developed County of San Diego public right of way. All work in the contract shall be completed within Three Hundred Sixty-Five (365) calendar days of the date of the Notice to Proceed. The DWSRF funding. DBE/MBE/WBE participation. Bonds required. Prevailing wages.

Valley Center Municipal Water District (VCMWD) CA

District Engineering
 (760) 735-4500
 Login or create an account To view email

Published 07/20/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.