ID 568203

Archived

Long Beach Boulevard Water Service Lateral Replacement, South Gate, CA

Los Angeles County

Owner Reference: 638-WTR

Bid Date: 02/22/2021 at 11:00AM

Pre-Bid: 01/20/2021
Webcast

Estimate: $1.3 Mil

The work consists of reconstructing the water meter services to replace existing plastic service lines with copper piping, replacing dry barrel fire hydrants with wet barrel hydrants, abandoning existing service laterals, valves, and fittings, relocating fire hydrants, and replacing valves. Also, include abandoning the existing 4-inch cast iron main in Independence Avenue. The construction limits are in the City of South Gate: in Long Beach Boulevard from Tweedy Boulevard to Santa Ana Street, and in Independence Avenue, from Long Beach Boulevard to Victoria Avenue. Prevailing wages. Bonds required.

City of South Gate, Public Works, CA

Chris Castillo
 (323) 563-5779
 (323) 582-3106
 Login or create an account To view email

Published 12/24/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.