ID 589203

Archived

MD 376 (Bay St.) from US 113 to East of Flower St. Geometric Improvements, Worcester Co., MD

Worcester County

Owner Reference: WO1555187

Bid Date: 06/24/2021 at 12:00pm

This project, located in Worcester County, is for the construction/extension of US 113 (Worcester Highway) Southbound left turn lane and geometric improvements/base widening of MD 376 (Bay Street) existing pavement to extend turn lanes. Beginning at the intersection of US 113 and ending east of Flower Street for a total distance of 0.19 miles The work will consist of the following: Fine Milling and resurfacing of the roadway; Full depth construction; Full Depth and Partial Depth Patching; Traffic barrier; Curb and Gutter, Sidewalk, Detectable Warning Surface; Drainage and Stormwater management; Landscaping; Maintenance of Traffic; Erosion and Sediment Control; Signing and pavement markings. DBE goal 12%. Bonds required. Prevailing wages apply.

State of Maryland Department of Transportation (MDDOT) MD

James Meredith
 (410) 531-5533
 (410) 543-6559

Published 06/03/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.