ID 559073

Archived

Midway Road Revitalization Project, Addison, TX

Dallas County

Owner Reference: 20-186

Bid Date: 10/29/2020 at 02:00PM

Pre-Bid: 10/14/2020
Addison Treehouse Event Room, 14681 Midway Road, Suite 200, Addison, TX 75001

The project consists of the reconstruction of Midway Road from Spring Valley Road to Keller Springs Road. The project includes the construction of approximately 102,000 SY of concrete pavement, 7,000 SY of side path trail and sidewalks, 12,000 LF of 6-inch to 24-inch water line, and 8,300 LF of 6-inch to 15-inch sanitary sewer main. The project also includes signalization improvements, illumination improvements, and median and parkway landscaping improvements. Questions are due by 5:00 PM on Oct 21st. Bonds required. Prevailing wages apply.

Town of Addison

Chelsea Gonzalez
 (972) 450-7051
 (972) 450-7096
 Login or create an account To view email

Published 10/03/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.