ID 640125

Archived

Miles Lane Sewer Pump Station Rehabilitation, Watsonville CA

Santa Cruz County

Owner Reference: SS-22-14798

Bid Date: 10/06/2022 at 02:00pm

Estimate: $1,255,000

Trades: A - General Engineering Contractor GEC

The Work generally consists of replacing the existing sanitary sewer lift station with a new lift station. The major elements of the Work include: a new sanitary sewer pump station with wet well, valve vault, two 3 HP pumps, controls and associated piping; 35 LF of 4-inch PVC force main, 35 LF of 8-inch PVC gravity sewer and one new sanitary sewer manhole; new emergency generator; rehabilitate 355-LF of existing 6-inch sewer main by relining with cured-in-place pipe. Additive bid alternate item: Provide 820-LF of 2-inch conduit in Miles Lane from the pump station to the north side of Freedom Blvd. 230 working days.

City of Watsonville CA

Danielle Green
 (831) 768-3102
 Login or create an account To view email

Published 09/10/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.