ID 637408
Archived
Larimer County
Owner Reference: 1240LP22Q0105
Bid Date: 08/31/2022 at 01:00pm
Trades: CO-01 - General Engineering Contractor GEC
Total Small Business Set-Aside, 237990 - Other Heavy and Civil Engineering Construction. This project is for the contractor supplied and installed debris boom on Monarch Lake to provide for interception and removal of debris before it reaches the dam. Monarch Lake is located on the Sulphur Ranger District on the Arapaho and Roosevelt National Forest and Pawnee National Grasslands. The contractor is responsible to provide all labor, equipment, supplies, and materials for the supply and implementation of the debris boom. Bonds required. Prevailing wages.
US Department of Agriculture WA
Stephen Holly
6055171170
Login or create an account To view email
Published 08/14/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.