ID 602464

Archived

Mulberry River Stream Restoration Project, Braselton, GA

Gwinnett County

Bid Date: 11/04/2021 at 10:00am

Pre-Bid: 10/14/2021
Town of Braselton Public Works Building, 4986 Highway 53, Braselton, GA 30517

The Project consists of, but is not limited to the following major elements: Stabilize the banks of the Mulberry River by creating a more stable pattern and profile. This will be accomplished by modifying the existing stream channel and constructing Bankful Benches, Toe Wood, Rock J Hooks and Low Flow Deflectors to reduce the shear stress on the banks of the River. Approximately 32,000 Cubic Yards of material will be removed and deposited on adjacent lands. Questions can be submitted by phone or email. Insurance requirements.

Bonds required.

Town Of Braselton GA

Ken Peters
 (770) 962-1387
 Login or create an account To view email

Published 09/28/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.