ID 602464
Archived
Gwinnett County
Bid Date: 11/04/2021 at 10:00am
Pre-Bid: 10/14/2021
Town of Braselton Public Works Building, 4986 Highway 53, Braselton, GA 30517
The Project consists of, but is not limited to the following major elements: Stabilize the banks of the Mulberry River by creating a more stable pattern and profile. This will be accomplished by modifying the existing stream channel and constructing Bankful Benches, Toe Wood, Rock J Hooks and Low Flow Deflectors to reduce the shear stress on the banks of the River. Approximately 32,000 Cubic Yards of material will be removed and deposited on adjacent lands. Questions can be submitted by phone or email. Insurance requirements.
Bonds required.Town Of Braselton GA
Ken Peters
(770) 962-1387
Login or create an account To view email
Published 09/28/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.