ID 630158
Archived
Los Angeles County
Owner Reference: 21-008
Bid Date: 06/23/2022 at 10:00AM
Pre-Bid: 06/08/2022
Project site located at (the end of the Ave) 7900 Ocean View Ave, Whittier, CA 90602, Only prime contractors that are present and sign in will be allowed to bid the project.
Estimate: $8,510,600
Trades: A - General Engineering Contractor GEC
The Murphy Reservoir Replacement project consist of construction of a 2.31 Million Gallon (MG) prestressed concrete reservoir including exterior stairway, interior ladder, access hatches, vent, overflow pipe, drain line inlet, outlet line, sample taps, and miscellaneous appurtenances; demolition and removal of the existing two 0.5 MG concrete reservoirs; grading of the site; shotcrete wall; concrete masonry block retaining wall; installation and removal of two HDPE 10,000 gallon temporary water storage tanks (City Purchased); temporary 12” HDPE piping and fittings; approximately 750’ of 16” DIP inlet/outlet line; approximately 126’ of 12” inlet line; approximately 75’ of 12” drain/overflow line; approximately 165’ of 8” drain/overflow line approximately 1,175’ of concrete curb and gutter and concrete swale; approximately 20,750 SF of AC Pavement, approximately 23,100 SF of aggregate base; connections to existing line, miscellaneous appurtenances including valve vault, check valves, flex tend flexible joint; underground conduits for power and SCADA; connection of the new electrical and SCADA to the Murphy Pump Station; level controls for the reservoir; miscellaneous lights and controls; and miscellaneous site work. All work shall be completed in accordance with the project plans as specified hereinafter, project specifications as specified hereinafter for the Whittier Utility Authority, Los Angeles County, State of California, and in accordance with the Standard Specifications for Public Works Construction (The Greenbook), 2018 Edition. All material that comes into contact with potable water shall be NSF 61 compliant. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project, The Contractor shall commence ordering all necessary materials within ten (10) working days after notification that the contract has been executed and shall be completed within Three Hundred and Forty Eight (348) working days after date set forth in the Notice to Proceed. See attached for milestone requirement dates. Bonds required. Prevailing wages.
City of Whittier CA
Public Works
(562) 567-9500
Login or create an account To view email
Published 05/26/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.