ID 627445
Archived
San Bernardino County
Owner Reference: SB-89-DE-22
Bid Date: 06/02/2022 at 02:00pm
Estimate: $880,000
Trades: A - General Engineering Contractor GEC
The general items of work to be done consists of removing an existing traffic signal and its facilities, installing new traffic signal poles, mast arms, emergency vehicle detectors, battery back-up system, control assemblies, pull boxes, pole foundations, conduit undergrounding, access ramp improvements, AC paving, signing and striping, as well as performing video inspection of sewer, installing curb opening catch basins, reinforced concrete pipes, restoring all improvements to preconstruction conditions, and all related work required as indicated on the project plans for the N. Cherry Avenue at Live Oak Avenue Traffic Signal Modification Project. Questions are due by 2:00 PM on May 28th. Project duration is 40 working days with a potential start date of July 2022. Bonds required. Prevailing wages.
City of Fontana CA
Sid Lambert
(909) 350-7678
Login or create an account To view email
Published 05/02/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.