N. Industrial Water & Sewer Extension Project, Lakeview, OR

Lake County

Bid Date: 04/22/2021 at 02:00PM

Generally, the work consists of installation of 2,750 feet 10" C900 DR 18 pipe (ALTERNATE: 10" Ductile Iron Pipe or ALTERNATE 12" HDPE Pipe) and 2,720 feet of 3" Schedule 80 pipe (ALTERNATE 3" Ductile Iron Pipe or 4" HDPE Pipe), 640 lineal feet of bores, 9 fire hydrants, 4 grinder pumps, and other related work. Bonds Required. Prevailing Wages.

Town of Lakeview, OR

Michelle Parry
 (541) 947-2020

Published 04/12/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.