ID 610622

Archived

Naked Falls & Stebbins Creek Bridge Replacement, Skamania County, WA

Skamania County

Owner Reference: DNR 22-E02

Bid Date: 02/11/2022 at 12:00PM

Pre-Bid: 01/20/2022
Site Location - Naked Falls, Stevenson, WA

Estimate: $207,653

Trades: General Engineering Contractor GEC

The project consists of:  Site A (Naked Falls Bridge): The project consists of, but is not limited to, providing all materials, labor and equipment necessary to remove the existing 80' Glulam bridge (owner provided) perform required design alterations of the substructure and wing walls, installation of new substructures, installation of a new 18' x 100' Big R steel bridge, wing wall deadman installation and rip rap rock armoring, as well as associated bridge approach work.   Site B (Stebbins Creek Bridge): The project consists of, but is not limited to, providing all materials, labor and equipment necessary to remove the existing 60' Glulam bridge(owner provided) perform required design alterations of the substructure and wing walls, installation of new substructures, installation of a new 18' x 80' Big R steel bridge, as well as associated bridge approach work.

Bonds required. Prevailing wages.

State of Washington Department of Natural Resources WA

Sandra Swenson
 (360) 902-1159
 Login or create an account To view email

Published 12/10/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.