ID 628864

Archived

New Design Water Treatment Plant Lagoon Residual Removal & Disposal, Tuscarora, MD

Frederick County

Owner Reference: 22-612

Bid Date: 06/14/2022 at 02:00pm

Pre-Bid: 05/26/2022
https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTc2MDJkNmUtOGZlOS00MThkLWIxYWMtYmRiNjEwY2ViMThk%40thread.v2/0?context=%7b%22Tid%22%3a%2248c6342d-3806-4843-9dec-6a40b1bb8737%22%2c%22Oid%22%3a%223d8a610d-30e2-4e40-a9f1-d60197327649%22%7d Or Phone: 667-217-6643 Code: 970 096 494#

Trades: WWTP Wastewater Treatment Plant Construction & Repair: Tank Power Wash, Pressure Washing - General Engineering Contractor, Waste Management & Remediation Services: Garbage, Trash, Recycling Collection & Disposal NAICS 562111

This contract consists of furnishing all labor, equipment, supervision, transportation and permits necessary for the removal and disposal of residual liquefied solids from the New Design Water Treatment Plant (NDWTP) lagoon and pre-sedimentation basin. The Contractor is to ensure that disposal is in accordance with all Federal, State and Municipal applicable laws and regulations governing the disposal of this type of material and service. The capacity of the .84 acre lagoon is approximately 4,000,000 gallons, the sides slope inward to a 14ft depth. (see Attachment 9) The last cleaning occurred in 2019. A total of 2,947,000 gallons were transported. Questions due no later than 4:00 PM on May 31, 2022.

County of Frederick MD

Brian Stieg
 (301) 600-6702
 Login or create an account To view email

Published 05/16/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.