ID 558882
Archived
Fort Bend County
Owner Reference: WHXH7524
Bid Date: 11/04/2020 at 10:00AM
Pre-Bid: 10/14/2020
Water Plant Site - 214 1/2 Renfrow-Burford Road, Fresno, Tx 77545
Estimate: $3.7M
This project’s work consists of the construction of a new groundwater plant including a 1,500 gpm water well, 500,000 gallon bolted, galvanized steel ground storage tank, four (4) 1,500 gpm booster pumps, two (2) 15,000 gallon hydropneumatics tanks, chlorine disinfection equipment, electrical controls, drainage system and site work. The project will also consist of the installation of approximately 1,180 linear feet of 12-inch off-site waterline. Bonds required. Prevailing wages apply. Bonds required. Prevailing wages apply.
Fort Bend County Fresh Water Supply District #1, TX
David Dybala
(713) 855-1917
Login or create an account To view email
Published 09/30/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.