North Seattle Mobility Improvements Package 1, Seattle, WA

King County

Owner Reference: 2020-057

Bid Date: 12/08/2021 at 02:00pm

Estimate: $2.6M-$2.8M

Trades: General Engineering Contractor GEC

Work includes pavement and sidewalk removal, paving, storm drain modifications, sidewalk installation, curb ramps, pedestrian lighting, transit stops, signing and channelization.  The Move Seattle program has a
23% utilization WMBE goal.

Bonds required. Prevailing wages.

City of Seattle WA

Peter Trinh
 (206) 684-8032
 Login or create an account To view email

Published 11/17/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.