ID 630036
Archived
Lake County
Bid Date: 06/14/2022 at 11:00am
Trades: A - General Engineering Contractor GEC
Rehabilitation of 6-inch sanitary sewer main by CIPP includin greinstate laterals and install cured-in-place top hat, pre-liner, replace 6-inch sanitary sewer main with 6-inch PVC by open cut construction; reconnect laterals to new sewer main by open cut construction, asphalt concret trench paving; traffic control, trench shoring and bracing. 20 working days. Bonds required. Prevailing wages.
Hidden Valley Lake Community Services District CA
(707) 987-92015
Published 05/25/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.