ID 629905
Archived
Citrus County
Owner Reference: ITB 22-096
Bid Date: 06/29/2022 at 02:00pm
Pre-Bid: 06/02/2022
https://teams.microsoft.com/l/meetup-join/19%3ameeting_Y2E4YWVhMjEtYTIzZC00ZGE1LTg0NjItMDg5M2U3ZTc5YjU1%40thread.v2/0?context=%7b%22Tid%22%3a%226bbaf887-dd15-4d63-b8cf-1b1dba1f2bfb%22%2c%22Oid%22%3a%220fc19d10-ef1f-4178-acc6-17ea2102c425%22%7d
Estimate: $4.9M
Trades: CG - General Engineering Contractor GEC, RG - General Engineering Contractor GEC
Citrus County, Florida (“County”) invites interested parties to submit a Bid to provide complete construction of the Northwest Quadrant Water Main Extension Project to include 1,953 feet of 18" ductile iron, 14,336 feet of 10” PVC, and 14,691 feet of 8" PVC along with fire hydrants, valves, and Right of Way (ROW) restoration along US 19, W. Ashburn Lane and N. Williams Avenue north of Crystal River, Florida. All work shall be in accordance with the construction plans, special provisions, and contract documents. Included in these specifications is a geotechnical report conducted by Geo-tech Engineering Consultants and a subsurface utility report conducted by George F. Young, Inc. for this project. Also included is a geotechnical report from Madrid Engineering Group, Inc. and a subsurface utility report from George F. Young, Inc. for the NW Quadrant Wastewater Extension project which is proposed to be constructed along much of the same corridor. These reports are intended to assist the contractor in the estimation of existing utility lines present and the limerock encroachment possible that will need to be excavated and removed in the project area. Bonds required. Prevailing wages.
County of Citrus FL
Linda Morse
(352) 527-5446
Login or create an account To view email
Published 05/24/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.