ID 641344
Archived
Travis County
Owner Reference: IFB 6100 CLMC906
Bid Date: 10/13/2022 at 02:00pm
Pre-Bid: 09/27/2022
https://teams.microsoft.com/dl/launcher/launcher.html?url=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_NGRmMzAyMGMtYmI2Yy00ODUzLThmMGItMTBiNWQ1M2VkMjZk%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%25225c5e19f6-a6ab-4b45-b1d0-be4608a9a67f%2522%252c%2522Oid%2522%253a%25223234e7cc-a54b-4cd4-a743-cad32e2111d8%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=26f40d61-e865-4ac5-8f69-0bfcff0dd3a0&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true
Estimate: $444,050
Trades: General Engineering Contractor GEC
The Work consists of consists of furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of an approximately 82-ft long tangent pile wall comprising 2-ft diameter augered concrete piles 35-ft deep at the Onion Creek Odor Control Facility. DBE/MBE/WBE particiipation requirements. Bonds required. Prevailing wages.
City of Austin TX
Cara Lynk
(512) 974-5653
Login or create an account To view email
Published 09/20/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.