ID 580037
Archived
Bexar County
Owner Reference: CO-00414-FG/20-7011
Bid Date: 04/23/2021 at 10:00AM
Pre-Bid: 04/07/2021
https://saws.webex.com Meeting number (access code): 187 439 3936
Meeting password: jM8dmmQi29D Audio Connection: (210) 233-2090
Estimate: $1.75 Mil
San Antonio Water System for the construction of approximately 30 LF of 8” PVC, 650 LF of 12” ductile iron, 40 LF of 16” ductile iron, 15 LF of 20” ductile iron, 1,558 LF of 24” ductile iron, and 146 LF of 30” ductile iron water main using open-trench methods and mill and overlay pavement restoration in Northwest Bexar County within the City of San Antonio along Lockhill-Selma from the intersection of Lockhill-Selma and Huebner Road to Orsinger Lane while maintaining two-way traffic for the Park Forest Water Main Improvements Project. Bonds required. Prevailing wages. Q&A due by 04/12/21 at 10AM. SMWVB goals.
San Antonio Water System (SAWS), Contracting Office, TX
Florinda Gonzales
(210) 233-3914
(210) 233-4290
Login or create an account To view email
Published 03/25/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.