Park Way CSS Improvement Project, Sacramento, CA

Sacramento County

Owner Reference: B22141321002

Bid Date: 10/29/2021 at 03:00pm

Estimate: $95,000

In general, this project requires the reconstruction of combined sanitary sewer facilities on Park Way (33rd to 35th St's) and 33rd St, just south of Park Way. The work to be performed consists of installing backflow prevention flap valves on nine (9) drain inlets along Park Way and 33rd Street and sealing five (5) manholes along the same alignment. The Contractor shall provide all labor, materials, tools and equipment, and shall perform all work necessary to complete the subject project in place and make all required connections to the existing combined sewer system as shown on the Plans and as specified in the attached. Project duration is 45 working days. Questions are due no later than 12:00 PM on Oc 21st. Subcontractor and LBE Participation Verification required. 

Bonds required. Prevailing wages.

City Of Sacramento CA

Richard Dalrymple
 (916) 808-1446
 Login or create an account To view email

Published 10/16/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.