ID 634846

Archived

Pavement Improvements, Buchanan & Andrew Counties, MO

Buchanan County

Owner Reference: 220819-A01

Bid Date: 08/19/2022 at 11:00am

Estimate: $7.5M to $10M

Trades: Highway, Parking Lot, Road Improvement, Pavement Repair: Resurface Cold Mix Slurry Chip Seal - General Engineering Contractor, General Engineering Contractor GEC

Project description: Job J1I3268 Route I-29 Andrew and Buchanan County. Pavement improvements from south of Rte. 71 to south of Rte. O near St. Joseph, the total length of improvement being 13.59 miles. Contract Time: 11/30/23. DBE goal 5%. Bonds required. Prevailing wages.

State of Missouri Department of Transportation (MODOT) MO

Design Division - Central Office
 (573) 751-2876
 (573) 522-2281

Published 07/18/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.