ID 640276

Archived

Pavement Improvements, Warren & Lincoln Counties, MO

Warren County

Owner Reference: 221021-B01 / FAF 47-1(88), FAF 47-1(89)

Bid Date: 10/21/2022 at 11:00am

Estimate: $7.5M to $10M

Trades: General Engineering Contractor GEC, Highway, Road/Parking Lot, Bridge, Dam, Overpass, Runway Repairs: Road Improvement/Pavement/Resurface/Cold Mix/Slurry/Chip Seal

Project description: Job J2P3216 Route 47 Warren County. Pavement improvements from 0.1 Mile South of Routes M and MM in Warrenton to Missouri River Bridge in Washington, the total length of improvement being 21.571 miles.(2): Job J2P3304 Route 47 Lincoln, Warren County. Pavement improvements from Route A in Hawk Point to 0.2 mile North of I-70 in Warrenton, the total length of improvement being 10.442 miles. Project description: Contract Time: 11/1/23. DBE goal 4%. Bonds required. Prevailing wages.

State of Missouri Department of Transportation (MODOT) MO

Design Division - Central Office
 (573) 751-2876
 (573) 522-2281

Published 09/12/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.