ID 623682

Archived

Pavement Preservation, Old Bush Hwy to Cline Cagin Rd, Maricopa County, AZ

Maricopa County

Owner Reference: F041001C, Proj 087-B-(227)T

Bid Date: 06/03/2022 at 11:00am

Estimate: $1,773,000

Trades: Earthwork and Paving Contractor - General Engineering Contractor

DBE goal 6.44% On SR 87 between milepost 201.10 and 204.30, northeast of Fountain Hills. The work consists of removing the existing asphalt-rubber asphaltic concrete friction course (AR-ACFC) by milling and replacing with new AR-ACFC. The work also includes milling the existing pavement and replacing with new asphaltic concrete (AC) and ARACFC for spot repair, pavement marking, and other related work. 65 working days. To submit a valid bid, the bidder must (1) have prequalification from the Department as necessary for the project, and (2) be included on the project Plansholder List as a Prime. Bonds required. Prevailing wages.

State of Arizona Department of Transportation (AZDOT) AZ

Iqbal Hossain
  (602) 712-4398
 Login or create an account To view email

Published 03/31/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.