ID 628358
Archived
Kern County
Owner Reference: T2K309 (Actual Bid Request) STPL_5109(270)
Bid Date: 06/02/2022 at 11:00AM
Estimate: $5,776,573.00
Trades: A - General Engineering Contractor GEC
The work to be performed consists, in general, of pavement rehabilitation on California Avenue between Union Avenue and Washington Street. Work shall include full depth reconstruction of the existing pavement. Other items include roadway excavation, construction of new pavement using Hot Mix Asphalt (HMA), installation of pavement striping and markings, traffic detector loops, modification of existing curbs and gutters, access ramps to meet current ADA standards, installation of cross gutters, and adjustment of water valves, cleanout, manholes and monuments. Project duration is 65 working days. DBE Contract Goal: 14% Subject to "Buy America" provisions. Bonds required. Prevailing wages.
City Of Bakersfield CA
Gurjeet S. Antal
(661) 326-3724
Login or create an account To view email
Published 05/11/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.