ID 615142

Archived

Phase 2B Water Main Replacement Project, Holyoke, MA

Hampden County

Bid Date: 02/09/2022 at 01:00pm

Pre-Bid: 01/26/2022
Holyoke Water Treatment Plant at 600 Westfield Road, Holyoke, MA.

Trades: General Engineering Contractor GEC

The work consists of providing approximately 10,800 feet of 6-inch through 16-inch diameter ductile iron water main, new valves, hydrants, and connections to intersecting streets. The work also includes reconnecting new water services from the old water main to be abandoned to the new water main, abandonment of existing water main, and surface restoration. Bids shall be on a unit price basis, as indicated in the Bid Form. 

Bonds required. Prevailing wages.

City of Holyoke MA

David Partridge
 413-572-3267
 Login or create an account To view email

Published 01/20/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.