ID 585434

Archived

Piedmont Walk Trail Extension Phase 2, Piedmont, MO

Wayne County

Owner Reference: 00020

Bid Date: 05/18/2021 at 10:00AM

The project shall consist of construction of approximately 1,550 linear feet of 6” wide and 4” thick asphalt extension of the City's pedestrian trail including a 20' prefabricated pedestrian walk bridge to tie Handy Park. located between Fir and Elm Streets, to the existing trail system in Ash Park (Allen Street). Bonds required. Prevailing wages.

City Of Piedmont, MO

Bill Kirkpatrick
 (573) 223-7660
 (573) 223-4052

Published 05/06/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.