ID 615146
Archived
Middlesex County
Owner Reference: PW-22-03
Bid Date: 02/10/2022 at 02:00pm
Estimate: $1,100,000
Trades: General Engineering Contractor GEC
The work involves the following major item (s): Installation of approximately 3,500 linear feet of 16”, 12”, 8” and 6” ductile iron water main, approximately 600 linear feet of copper water service piping, fittings, fire hydrants, ductile iron gate valves, and other related water system work on Pike Street and Astle Street. Additional work includes temporary and permanent trench paving of approximately 4,000 linear feet and all other related work as specified. MassDOT prequalification required in Sewer and Water. Deadline for questions is February 2, 2022 by 2:00pm.
Bonds required. Prevailing wages.Town of Tewksbury MA
Andrew Stack
(978) 640-4440
(978) 640-4445
Login or create an account To view email
Published 01/20/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.