ID 628692
Archived
Kitsap County
Bid Date: 06/02/2022 at 10:30am
Estimate: $2.8M - $3.1M
Trades: General Engineering Contractor GEC
Contract provides for the improvement of stormwater conveyance infrastructure, vehicular and pedestrian paving, and construction of a new inlet and outfall to Stephenson Creek. Work includes: installation and maintenance of erosion and sediment controls; sawcutting, removal, repair, and installation of asphalt pavements, cement concrete sidewalks, cement concrete curbs and gutters, asphalt-thickened edge; installation of catch basins, storm sewer pipe, creek inlet and outfall structures; landscape restoration, and temporary traffic control. 160 working days. Bonds required. Prevailing wages.
City of Bremerton WA
Gunnar Fridriksson
(360) 473-5758
Login or create an account To view email
Published 05/14/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.