ID 570875

Archived

Potential Subcontractor Lead: Hot Springs MS4 Improvement, Willard, UT

Box Elder County

Owner Reference: UDOT210158CN

Bid Date: 02/03/2021 at 02:00pm

Pre-Bid: 01/13/2021
9025 South Hwy 89 Willard, UT 84340

The purpose of this IFB is to enter into a contract with the lowest responsive and responsible bidder to provide construction services related to Demolition of existing pump house and mag tank. Construction of a new gravel road and pad behind the existing maintenance facility. Design and construction of a new evaporator building (see Division 13000 for Delegated Design requirements). Extending utility service to the new building including utility connections & fees. Addition of a waterway, inlet, catch basin, and storm drain piping & structures to route storm water runoff away from the existing pond. Installation and commissioning of various evaporation process components including evaporator, tanks, pumps, sensors, wet well, etc. Install connecting pipes from wet well to pond with stand pipe & apron. Various asphalt patches. Miscellaneous swales, channels & area drains. Excavation, grading and other earthwork are also required as part of the work. Bonds required.

State of Utah Department of Transportation UT (UTDOT)

Cody Nelson
 (801) 965-4000
 Login or create an account To view email

Published 01/13/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.