This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450

ID: 570875

Potential Subcontractor Lead: Hot Springs MS4 Improvement, Willard, UT

Box Elder County

Owner Reference: UDOT210158CN

02/03/2021
Past bid date

Pre-Bid:  Login or create an account to see more project details. Basic membership is FREE

Trades: General Engineering Contractor GEC, Subcontractors, SEE DESCRIPTION

Licenses: A

The purpose of this IFB is to enter into a contract with the lowest responsive and responsible bidder to provide construction services related to Demolition of existing pump house and mag tank. Construction of a new gravel road and pad behind the existing maintenance facility. Design and construction of a new evaporator building (see Division 13000 for Delegated Design requirements). Extending utility service to the new building including utility connections & fees. Addition of a waterway, inlet, catch basin, and storm drain piping & structures to route storm water runoff away from the existing pond. Installation and commissioning of various evaporation process components including evaporator, tanks, pumps, sensors, wet well, etc. Install connecting pipes from wet well to pond with stand pipe & apron. Various asphalt patches. Miscellaneous swales, channels & area drains. Excavation, grading and other earthwork are also required as part of the work. Bonds required.

Cody Nelson
 Upgrade Membership
 Upgrade Membership


570875.pdf
Published 01/13/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.