ID 541602

Archived

Professional Engineering Services for Lift Station No. 26, 45 and 51 Improvements Project, West Palm Beach FL

Palm Beach County

Owner Reference: 19-20-401

Bid Date: 06/23/2020 at 03:00pm

Pre-Bid: 06/04/2020
Conference Room 519 - City Hall, 401 Clematis Street, West Palm Beach, Florida 33401.

Lift Station No. 26 (LS 26) is located at the northeast corner of 45th Street and N. Flagler Drive in Gettler Park. It was built in the 1980's. The station is currently a triplex station equipped with a valve vault, wetwell, and submersible type pumps. The City plans to use the existing pumps in the new lift station configuration. The station serves the surrounding areas through a network of gravity sewers. All flow conveyed to LS 26 is pumped into a twelve (12) inch forcemain and subsequently into a downstream gravity sewer system. The project includes improvements to the gravity collection system including the modification of the receiving manhole, which will receive all gravity wastewater prior to discharge to the new wet well. The average daily flow to LS 26 is approximately 0.41 million gallons per day (MGD). This project encouraged MBE/WBE participation.

City of West Palm Beach, FL

Patricia Armstrong
 (561) 822-2100
 Login or create an account To view email

Published 06/02/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.