ID 579927

Archived

Raw Water Infrastructure & Groundwater Treatment Plant, Caldwell County, TX

Caldwell County

Owner Reference: RFP 2021-001

Bid Date: 05/04/2021 at 02:00PM

Pre-Bid: 04/06/2021
Web Meeting. Meeting details to be sent to all plan holders one week prior.

Construction of a groundwater treatment plant (GWTP) for Alliance Regional Water Authority (AWRA). AWRA has acquired approximately 568-acres of land in Caldwell County for the development of a groundwater wellfield including acres for a new GWTP facility. In addition to the groundwater produced from the ARWA wells, the new GWTP will also treat water from the nearby Guadalupe-Blanco River Authority (GBRA) wellfield. The new wellfield and groundwater treatment facility will be developed in phases, with this initial phase, 1B, having a treatment capacity of 19.51-MGD. The work described for this project includes: • ARWA Well Pumps and Pump Discharge Piping • Well Field Collection Piping and Roads • Raw Water Storage Tanks • Chemical Feed Systems • Filters in Filter Building • Clearwells • High Service Pump Station and Electrical Building • Administration Building • Solids Handling Facilities. Bonds required. Prevailing wages apply. HUB participation: 11.2% (GFE required).

Alliance Regional Water Authority, TX

Delaney MscDonald
 (210) 664-0758
 Login or create an account To view email

Published 03/26/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.